Hebrew Rehabilitation Center - Roslindale, MA
Summary:
Various projects throughout the Hebrew Campus
Value: $1,000,000
Highlights:
Chiller upgrades, DHW Electronic mixing valve installation, Air handler, and Steam heat Exchanger replacements.
Our Service department installed linkage-less burner controls on four steam boilers to maximize efficiency and provide fuel savings.
SANOFI - Framingham, MA
Summary:
Fraser Engineering Served as General Contractor on this Design-Build Project with Various Mechanical HVAC Upgrades.
Value: $800,000
Highlights:
Installation of 450’ of 10” Perm-Pipe and 450’ of 6” condensate between the steam vault and building.
Replacing an existing underground steam and condensate line.
University of Massachusetts Lowell – Lowell, MA
Summary:
Design Build Project of Energy Upgrades campus wide including various Mechanical and HVAC upgrades.
Value: $10,000,000
Highlights:
Installed new HVAC Systems in the Tsongas Center
HVAC Modifications including AHU/VAV repairs and replacements throughout the university
Chiller replacements which include pumps, piping and electrical upgrades at Pinanski Hall, Lydon Library
HVAC upgrade in Fox Hall
Replaced boilers including all gas, water, flue piping and electrical systems at South Power Plant, Fox Hall, Inn & Conference Center
HVAC upgrades in Fox Hall
Replaced Air handler units which includes piping, insulation, sheet metal and electrical upgrades at the following Buildings: Costello, Cumnock, Lydon, Pinaski, Wannalancit
Fitchburg State University – Fitchburg, MA
Summary:
Maintenance, Energy Efficiency Upgrades Project
Value: $4,000,000
Highlights:
Demolition of the existing 250-ton absorption chiller in the Conlon Industrial Arts building, including demolishing the steam and condensate piping to mains.
Fraser Engineering installed a 400-ton chiller, pumps and associated piping
Replaced HVAC equipment, unit ventilators and steam baseboard radiation in various classrooms including electrical, sheet metal, insulation, and piping
Upgraded existing atmospheric gas boilers to High-Efficiency boilers. Replaced all associated piping and accessories. Installed a new gas line and flue piping.
Installed VFD’s and new motors on various pieces of equipment around the university
Worcester Public Schools – Worcester, MA
Summary:
Boiler Replacement Project in five schools throughout the City of Worcester.
Value: $1,000,000
Highlights:
Removed and replaced boilers and associated equipment at five schools throughout the city of Worcester.
The scope of work included Steam boiler upgrades, boiler feed water tanks, and new gas burners.
Fraser also installed new high-efficiency hot water boilers and water heaters.
Takeda - Lexington, MA
Summary:
New plumbing and process plumbing project
Value: $200,000
Highlights:
Lab waste and vent piping. All domestic water piping and relocating fixtures, RODI water and Lab gasses. Emergency eye and showers, relocated existing gas panels and stainless steel piping and valves.
Showa Women’s Institute Boston, Inc. - Boston, MA
Summary:
Multiple boiler upgrades throughout the complex.
Value: $100,000
Highlights:
Fraser installed a new steam boiler that feeds the steam kettles in the kitchen.
A new high-efficiency pool heater was installed along with all new pumps, electrical and controls.
Catholic Memorial High School - West Roxbury, MA
Summary:
Installation of new RTU’s for the gym.
Value: $300,000
Highlights:
Fraser’s Electrical department performed all electrical and controls for this project.
Part of this project was to run a 4” gas line up the side of the building securing to the roof and connecting to each unit.
UN1F1ED² Global Packaging Group - Sutton, MA
Summary:
Fraser installed multiple Weishaupt gas burners onto production equipment for this client.
Value: $250,000
Highlights:
Part of this project was to run a new 300’ of 6” gas line to each burner.
A startup and combustion efficiency test was performed by other certified technicians.
GE - Lynn, MA
Summary:
Multiple projects on campus
Value: $1,500,000
Highlights:
Installed steam heat exchangers for domestic water
Installed a high steam Pressure Reducing (200PSI -5PSI) station.
Fraser performed all rigging, welding and pressure testing for these projects.
Golden Cannoli - Chelsea, MA
Summary:
Fraser installed a new gas-fired Weishaupt
Value: $250,000
Highlights:
Ran a 6” gas line and installed a gas booster system for their processing plant.
Fraser Service self-performed all electrical, controls and start-up.
International School of Boston – Boston, MA
Summary:
Converting a steam heating system to hot water heating system in the Convent Building.
Value: $700,000
Highlights:
Fraser Installed two high-efficiency boilers and all needed accessories.
New radiators and a complete BMS control system were installed.
Summary:
Bourne Bridge for National Grid on a critical time-sensitive project.
Value:
Highlights:
Exceeded the scheduled timeline in getting the gas services back to normal operation.
Butane Offloading – Providence, RI
Summary:
Multi-Year Butane railroad car offloading, distribution and injection pipeline system construction
Value: $1,400,000
Highlights:
Services included pump installation, field distribution pipeline installation as well as instrument and controls tubing.
Supplied and installed entire range of structural steel pipe bridges, primary and secondary pipe support elements.
Performed 80% shop prefabrication to reduce system downtime.
Boston Logan International Airport – Boston, MA
Summary:
Aviation fuel facility infrastructure improvements
Value: $1,800,000
Highlights:
Replacement of 30” motor operated valves. Installation of new jet fuel filtration system and replacement of major truck offloading components.
Cut, drain and weld 30” main jet fuel suctions lines during overnight shutdowns.
Replaced safety reliefs on all refueler loading racks, hydrant cart test stands and diesel and mogas bulk loading stations.
Multi Year Jet Fuel Distribution System Upgrades
Summary:
Design/Build project with various mechanical HAVC
Value: $10,000,000
Highlights:
Multi-Year Jet Fuel Hydrant System infrastructure upgrades and Improvements. Services included pump replacement and alignments, 30” pipeline supply header replacement including pressure relief system improvements on a busy International Airport during selected day and nighttime shutdown. Provided shop prefabrication services to reduce downtime.
Cape Cod Canal Bridges – Bourne/Sagamore, MA
Summary:
270 psi transmission pipeline support repairs, pipeline modifications to enable robot inline inspection
Value: $2,000,000
Highlights:
Replacement of 10” transmission pipeline risers and associated pipe support system at Bourne & Sagamore Canal Bridges.
Installation of underground concrete vaults with inline inspection ports used for robotic crawler insertion. Replacement of various 10” pipeline sections below bridge girders, 160ft above canal waterline.
Natural Gas District Regulator Station Rebuild – Swampscott, MA
Summary:
Renovate historic Regulator Station externals and internals.
Value: $720,000
Highlights:
Replaced entire 200 psi to 60 psi to 14 inches w.c regulator system and tie piping into existing infrastructure.
80% shop fabrication to reduce downtime on site.
Provide new building roof, doors, windows, louvers, retaining walls including landscaping and pavement.
Natural Gas Water Bath Heaters – Everett, MA
Summary:
Water Bath Heater Replacement
Value: $510,000
Highlights:
Replace existing Water Bath Heater and associated 20” pipeline spools with new 46,000 LBS Heater.
All 20” pipe spool sections shop fabricated, sandblasted and painted as well as NDE tested to reduce downtime.
Provided new heater concrete foundation. Supplied and loaded heater with 11,000 gallons of Propylene Glycol.
Petroleum Terminal Maintenance – Revere, MA
Summary:
Various tanker truck loading rack improvements.
Value: $250,000
Highlights:
Loading Rack rebuilds and additions to various loading positions.
Layout and design was done in-house. All work performed during peak loading time hours and scheduled shutdowns.
Provided all structural steel support additions and alterations.
Martha’s Vineyard Hospital – Oak Bluffs, MA
Summary:
A new 90,000 square foot hospital was built for Partners Healthcare while the existing facility remained fully operational.
Value: $2,510,000
Highlights:
The Plumbing division at Fraser Engineering were employed to install plumbing and medical gas systems for the new facility. The project was a new, state of the art, 25-bed hospital, complete with two operating theaters and a birthing tub in the delivery room.
Martha’s Vineyard Hospital achieved a LEED Gold rating – the Highest LEED rated Hospital within the Commonwealth. Construction also included work in the emergency/trauma department, laboratories, PACU, LDR rooms, OR’s and patient rooms.
Lawrence Memorial Hospital – Medford, MA
Summary:
Fraser provided the general construction, mechanical, electrical, plumbing and sprinkler services for the Hospital.
Value: $1,194,403
Highlights:
Fraser Engineering completed upgrades to the infrastructure at Lawrence Memorial Hospital for Hallmark Healthcare in accordance with Thompson Consultants, Inc. The project consisted of replacing the air handling unit and working under a tight time constraint.
APT Realty – Woburn, MA
Summary:
Maintenance & various projects.
Value: $450,000
Highlights:
Service Department provides yearly maintenance at seven APT properties throughout MA; Performing work on all major equipment including; Chillers, boilers, pumps and exhaust fans. Other projects have included: Boiler repairs & installation, pump rebuild, repairs and replacements, mixing valve rebuilds & replacements along with major pipe repairs.
Mission Park – Boston, MA
Summary:
Maintenance & various projects.
Value: $1,000,000
Highlights:
Service department performs yearly maintenance and repairs on the boilers on site, as well as all mixing valves and related plumbing maintenance. Other projects have included complete renovation and upgrade of the mechanical system for heat and hot water, major repairs to the underground heating pipe, re-piping Levinson Building, domestic hot water replacement, replacement of 3-way valves, triple duty valves, gate valves and ball valves, relocation of relief valves, replacement of unit ventilators.
Moderna – Norwood, MA
Summary:
New pharmaceutical building installing stainless steel piping and two cooling towers.
Value: $1,400,000
Highlights:
Fraser install new stainless steel, low pressure steam supply from the clean steam generator in boiler room to 24 roof top air handling units. Also installed new stainless-steel condensate lines from the 24 roof top air handling units to condensate pumps. We also installed two new Cooling towers with supply and return pipe sizes of 18”and 14” as well as structure support needed for the piping.
First Realty – Boston, MA
Summary:
Maintenance & various projects.
Value: $350,000
Highlights:
Replace Buildings exhaust fans & electrical repairs, Install NTI combo DHW/Furnace, Install OSY & Gate Valves, Repair compromised 6” drain, Pipe repairs throughout facility, Water Main Replacement, Plumbing Upgrades
Harvard University – Cambridge, MA
Summary:
Maintenance & various projects for Moors Hall.
Value: $500,000
Highlights:
Service Department provides yearly maintenance and various repairs to the boilers at Harvard.
Other projects on site have included, re-tubing the Kewanee Boiler & Control Upgrades to the Cleaver Brooks Boilers. Installation of duel fuel Industrial Combustion burner with gas booster system.