GREAT PEOPLE DOING GREAT WORK
Summary:
Fraser installed multiple Weishaupt gas burners onto production equipment for this client.
Value: $250,000
Highlights:
Part of this project was to run a new 300’ of 6” gas line to each burner.
A startup and combustion efficiency test was performed by other certified technicians.
Multiple projects on campus
Value: $1,500,000
Installed steam heat exchangers for domestic water
Installed a high steam Pressure Reducing (200PSI -5PSI) station.
Fraser performed all rigging, welding and pressure testing for these projects.
Fraser installed a new gas-fired Weishaupt
Ran a 6” gas line and installed a gas booster system for their processing plant.
Fraser Service self-performed all electrical, controls and start-up.