A famous building, designed by a renowned architect back when electric heat was in vogue, needed an update to a more economical hydronic system. But it wasn’t as easy as running some pipes through the walls. To begin with, they’re solid concrete. There wasn’t a gas line into the building. And libraries and construction don’t really mix.

The challenge was supreme – especially when you consider the need for absolute humidity control in the archives. But we provided the high-quality, turnkey solution the client – and the job – required.

We can renovate – or replace – mission-critical systems while your building is in use. Call for a quote today.

LEARN MORE

 
 

Request a Consultation